Sweaty Betty

System: Organic Response

Commissioned For: Fagerhult Ltd

Details: Prime Interior Services undertook a CAT B fit-out for Sweaty Betty in London, which included demolition, complete fit-out, and furniture installation

Nodes: 126

  • Lighting Control Highlights:

    • Wireless emergency testing and reporting

    • Proximity-based IR messaging for enhanced energy savings

    • Individual daylight dimming per luminaire across open floor areas

Control products used

SN3 Integral Sensor Node

Organic Response sensor node for luminaire integration

OR Gateway

Organic Reponse IOT gateway for remote monitoring and control via Cloud interface

OR Surface Sensor

Organic Reponse surface sensor node for ceiling surface mounting and 12 DALI devices capacity

Previous
Previous

Kings Place

Next
Next

Watch House.